This guide will show how BOWREX is secured, lowered, retrieved, and operated from the deck. The deck setup focuses on the main line, deck cleat connection, hoisting line, pulley path, lowering procedure, retrieving procedure, and short-burst docking operation. BOWREX is intended to be carried on board, deployed when needed, and retrieved after docking. Deck photos, setup examples, and operation videos will be added here.
Deck cleat setup, main line use, lowering and retrieving procedure, and practical operation will be shown here.